Gold Coast Sewerage Plant – Pipe Repair (Case Study)
Work Performed Utilising our Blueline technology, Nuflow repaired 12m of a 750mm diameter reinforced concrete sewer line at
Work Performed Utilising our Blueline technology, Nuflow repaired 12m of a 750mm diameter reinforced concrete sewer line at
Work performed Utilising our Blueline technology, Nuflow repaired three metre long patches to stop water from infiltrating in
Work Performed Utilising our Blueline Technology, the Nuflow Albury-Wodonga team relined 2.8m of 150mm stainless steel pipe. Nuflow
Work Performed Utilising our Blueline technology, Nuflow installed sectional liners in multiple lengths of concrete stormwater pipes ranging