Case Studies

A million dollar pipe problem that could have cost lives

When the fire sprinkler system at the AMP Capitol building in…
Blacktown Facility

KEEPING ATLAS COPCO'S DISTRIBUTION NETWORK MOVING

When a busy spare parts distribution centre in Sydney was threatened…
Pipe Relining Saves Money

RELINING SAVES TIME AND MONEY FOR RESIDENTIAL DEVELOPER

Cracks in a 525mm concrete stormwater pipe threatened sign-off…
RACV Royal Pines Resort

CASE STUDY - RACV ROYAL PINES RESORT

THE PROBLEM There were ongoing blockages in sewage pipes servicing…
Greenline Pipe Repairs Installation

Case Study - Metro Trains

Using our Greenline solution, Nuflow South West repaired a 21…
Nuflow Pipe Relining - Steel Stormwater Pipe Restoration in rural Victoria

Mallacoota 1200 mm steel pipe

Work performed Nuflow South West Pipe Relining fixed a very…
Nuflow Pipe Relining - before and after stills taken from cctv inspection footage

Broadbeach Waters Carport

Work Performed Using our Blueline technology, we relined a…
Nuflow Pipe Relining | Pipe Repair Specialists | Case Study East Water Tower

EAST WATER TOWER

Work Performed Utilising our Blueline technology, Nuflow Wide…
Nuflow Pipe Relining | Pipe Repair Specialists | Case Study Gold Coast Sewerage Plant

GOLD COAST SEWERAGE PLANT

Work Performed Utilising our Blueline technology, Nuflow repaired…
Nuflow Pipe Relining | Pipe Repair Specialists | Case Study Tugan Bypass

TUGUN BYPASS

Work Performed Utilising our Blueline technology, Nuflow repaired…