Smart Lock
Smart Lock pipe relining
Broken and
damaged pipes
Cracks, holes
and splits
Redundant lateral connections
Decoupled and disconnected joints
Voids and pipes needing structural form and integrity
Heavy Infiltration
Applicable to a number of materials, including:
- Concrete
- VC
- PVC
- Steel
- Ductile Iron
- HDPE
- Composite piping
Key features of Smart Lock
Streamlined installation
Smart Lock can be installed in live flow conditions in 30 minutes with no curing time necessary.
Cost effective
As a permanent solution with easy installation, you can enjoy fewer labour costs and zero maintenance.
Repairs localised defects
Cracks, holes, root infestation, water infiltration, and offset joints are repaired by installing Smart Lock directly.
Long design life
With a design life of 50 years, Smart Lock is made from a material ideal for relining sewer pipes long term.
Adaptable to a range of circumstances
The stiffness of the seal can be altered to meet structural requirements by varying layers of fibreglass reinforcement.
Structural pipe restoration
Smart Lock can be designed as a stand-alone structural pipeline component, applying AS/NZS 25661.1:1998.
Industry approved
Smart Lock is approved by WRc, WSAA, and numerous authorities and councils for use in defective pipes.
Highly certified
The stainless steel sleeve, locking system, silicate resin, and fibreglass matting comply with all relevant standards.
Versatile
Smart Lock can be installed on a range of pipelines, with suitable processes for sizes between DN100 – DN900.
Built to last
Aggressive cleaning, root cutting, and relining can be done in future without concern of damaging the Smart Lock.
Benefits of Smart Lock pipe relining technology
- Permanently effective
- Leverage the latest technology
- Less environmental impact
- Greater cost savings
- Minimal disruption
- No excavation
- Free of maintenance post-installation
Smart Lock repair process
Pipe inspection
We utilise our CCTV technology to inspect pipes and determine the best way to approach a solution.
Clean and clear
We use hydro jetting to clear the pipe and ensure it is prepared for installation.
Smart Lock application
We utilise an inflatable packer to apply the Smart Lock and leave the silicate resin to cure in the sleeve.
Finalising the process
We confirm the Smart Lock has been successfully installed via CCTV inspection down the pipe.
QUALITY ASSURANCE
Reports can be obtained on:
- Flexural strength
- Flexural modulus
- Hardness
- Maximum load
- Tensile strength
Latest news
The Sydney Metro project is Australia’s biggest public transport project. By 2032, the New South Wales
We are proud to announce the launch of Nucoat, our latest in Spray in Place Pipe
At Nuflow, innovation is our guiding ethos. We are constantly looking to evolve our products and