Relining of Multiple Stormwater Pipe Sections

Nuflow was engaged to rehabilitate several stormwater pipe sections at a school site, addressing root intrusion, debris blockages and structural deterioration. Using CCTV inspection, high-pressure cleaning and Blueline trenchless relining, NuFlow restored reliable stormwater flow, improved structural integrity and extended the asset’s service life with minimal disruption to school operations.
Major Motorway M7 CCTV Investigation

Nuflow was engaged to carry out a CCTV investigation of a 375 mm stormwater line connected to a grated side entry pit on the Sunnyholt Road on-ramp of the M7 Motorway. Given the high-risk location on a major freeway, safety and traffic management were top priorities while advanced camera and tractor CCTV technology captured critical internal condition footage to inform future rehabilitation planning.
Trenchless Pipe Rehabilitation

Nuflow was engaged to rehabilitate a combined sewer and stormwater pipe system in Blacktown that had failed due to root intrusion, cracks and joint deterioration. Using trenchless Blueline relining and inspection technologies, NuFlow restored structural integrity and reliable flow without excavation, reducing disruption to council operations and the community.
Structural Rehabilitation Impreg UV Liner

Nuflow was engaged to rehabilitate a 300 mm reinforced concrete stormwater pipe at Vincent and Paul Court in Baulkham Hills. Using the advanced IMPREG UV structural liner system, NuFlow restored the pipe’s strength and service life without disruptive excavation, overcoming access challenges and debris obstructions to deliver a durable trenchless solution that minimised surface disruption.
Plant Room Pipe Rehabilitation

Nuflow was engaged to rehabilitate corroded and deteriorated steel pipes within a plant room at a commercial facility. Using trenchless relining techniques, they restored structural integrity and flow without disruptive excavation or costly shutdowns, enhancing reliability and extending pipeline service life.
Main Pool Drain Rehabilitation

Nuflow was engaged by Blacktown City Council to rehabilitate the main pool drain at Riverstone Swimming Centre. The 100 mm asbestos cement line showed signs of deterioration and obstruction, so NuFlow installed an 8.13 m Blueline liner with a new gate valve and riser to restore reliable drainage and improve long-term performance without disruptive excavation.
Sewer Line Rehabilitation

Nuflow was engaged to address a failed 100 mm PVC sewer line behind D Block at a NSW high school, where a broken inspection opening caused effluent spillage onto synthetic grass. Using trenchless Blueline relining, NuFlow restored sewer integrity without excavation, eliminated odour and health risks, and reopened the affected outdoor area with minimal disruption.
Stormwater Pipe Rehabilitation

Nuflow was engaged to fix persistent flooding and drainage failures behind C Block at a high school, where a compromised 225 mm PVC stormwater line was overwhelmed by silt, failed joints and root intrusions. Using CCTV inspection, high-pressure cleaning and Blueline trenchless relining with Ready Cure technology, NuFlow restored structural integrity and safe stormwater flow with minimal disruption to school operations.
Strengthening Critical Infrastructure with Advanced Relining

Nuflow was engaged to perform critical network maintenance for Icon Water, applying advanced trenchless relining techniques and confined space expertise to strengthen underground pipeline infrastructure, delivering a durable, watertight solution that ensures long-term reliability with strict safety and compliance standards.
Balcony Stormwater Pipe Rehabilitation

A concrete-encased stormwater pipe within a slab was failing at Newtown Arcade, causing leaks, flooding and moisture issues in lower tenancies. NuFlow used trenchless Blueline technology to reline and restore structural integrity without demolition, delivering a watertight, long-lasting result with minimal disruption.