Fire System Pipe Rehabilitation

NUFLOW NORTHWEST SYDNEY
ATLAS COPCO Bessimer Street Blacktown NSW 2148

PROJECT OVERVIEW

Atlas Copco’s busy spare parts distribution centre in Blacktown, Sydney, faced a critical challenge when corrosion and pitting were discovered in the copper fire main pipes beneath the facility’s main delivery and dispatch area. With the network located under a 150–200 mm- thick reinforced concrete slab, conventional replacement would have required costly excavation and extensive downtime. Nuflow was engaged to deliver a trenchless repair solution using their Redline epoxy pipe relining technology, ensuring the fire system remained operational without disrupting business operations.

CHALLENGE

The facility’s fire main network, comprising approximately 440 metres of 100 mm copper pipe, had suffered significant internal corrosion and pitting. Leaks had begun appearing on the slab surface, indicating a high risk of ongoing leakage or even catastrophic rupture. Traditional pipe replacement presented major obstacles:

  • Estimated replacement cost of around $650,000, largely due to concrete removal and reinstatement.
  • Prolonged site closure, potentially lasting weeks, disrupting thousands of daily truck movements.
  • Risk of substantial tenant compensation claims for downtime.
  • Environmental impact from concrete cutting and waste removal.

With Atlas Copco’s operations relying on uninterrupted load turnarounds, a conventional approach was not viable.

THE SOLUTION

Nuflow proposed a trenchless rehabilitation program to restore the system’s performance while avoiding excavation, downtime, and unnecessary costs.

THE RESULTS

Nuflow successfully rehabilitated the fire main system with zero downtime, avoiding the estimated $350,000 in additional costs associated with traditional pipe replacement. The relined network not only restored the fire system’s operational integrity but also improved flow rates. Relations between the building owner, facility managers, and tenants remained positive, with no loss of productivity or revenue. The environmentally friendly, non-invasive method eliminated concrete cutting, avoided landfill waste, and delivered a 50-year guarantee on the repair — ensuring the system will continue to perform reliably for decades.

NUFLOW’S AGING INFRASTRUCTURE MAINTENANCE AND REHABILITATION

For information on how Nuflow can help maintain and rehabilitate your potable water assets— including pressure main relining, concrete pipeline repairs, and trenchless rehabilitation of
critical supply infrastructure—contact our team of specialists. We deliver safe, compliant solutions for even the most complex potable water pipe repair projects.

Latest news

Nuflow was engaged to rehabilitate corroded and deteriorated steel pipes within a plant room at a commercial facility. Using trenchless relining techniques, they restored structural integrity and flow without disruptive excavation or costly shutdowns, enhancing reliability and extending pipeline service life.

Nuflow was engaged to address a failed 100 mm PVC sewer line behind D Block at a NSW high school, where a broken inspection opening caused effluent spillage onto synthetic grass. Using trenchless Blueline relining, NuFlow restored sewer integrity without excavation, eliminated odour and health risks, and reopened the affected outdoor area with minimal disruption.

Nuflow was engaged to perform critical network maintenance for Icon Water, applying advanced trenchless relining techniques and confined space expertise to strengthen underground pipeline infrastructure, delivering a durable, watertight solution that ensures long-term reliability with strict safety and compliance standards.