Nuflow responded urgently to a blocked disabled bathroom sewer at a NSW school during NAPLAN, clearing nearly 28 m of heavy debris with high-pressure cleaning and CCTV to restore access the same day with minimal disruption.
Nuflow responded urgently to a blocked disabled bathroom sewer at a NSW school during NAPLAN, clearing nearly 28 m of heavy debris with high-pressure cleaning and CCTV to restore access the same day with minimal disruption.
Atlas Copco’s busy spare parts distribution centre in Blacktown faced critical corrosion and pitting in its copper fire main pipes beneath a reinforced concrete slab, requiring a trenchless solution to avoid costly excavation and downtime.