Blueline<\/a> technology, were lined a broken pipe causing a sewerage blockage under a renovated carport at a residential property at Broadbeach Waters.<\/p>\nThe Problem<\/h2>\n
Blocked sewer line; a camera inspection revealed that the pipe was completely broken under the footing of the carport. Relining prevented excavation and removal of the structure.<\/p>\n
The Solution<\/h2>\n
We cut and cleared a broken section of pipe so sewerage could flow. A Blueline structural liner was inserted to create a new pipe inside the existing pipework.<\/p>\n
Alternatives<\/h2>\n
The client would have had to remove the carport or excavate down below the footings of the structure.<\/p>\n","protected":false},"excerpt":{"rendered":"
Work Performed Using our Blueline technology, were lined a broken pipe causing a sewerage blockage under a renovated carport at a residential property at Broadbeach Waters. The Problem Blocked sewer line; a camera inspection revealed that the pipe was completely broken under the footing of the carport. Relining prevented excavation and removal of the structure. […]<\/p>\n","protected":false},"author":5,"featured_media":4162,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":""},"categories":[16,14,13],"tags":[],"yoast_head":"\n
Broadbeach Waters Carport - Broken Pipe (Case Study) | Nuflow<\/title>\n\n\n\n\n\n\n\n\n\n\n\n\t\n\t\n\t\n\n\n\n\n\t\n\t\n\t\n