Government, Utilities and Civil

Nuflow can offer environmentally friendly relining solutions that are compliant to international standards and custom designed to suit your pipe project requirements. Installation by our team of technicians is conducted with the highest quality and in a strict Worksafe environment.

HOW WE HELP YOU

In-house Research and Development team including a chemical and Polymer engineer, to ensure we offer the latest equipment and product for your specific requirements.

f

We can custom design composite materials and lining to ensure a solution for specialty pipe projects.

f

All product is manufactured to ISO:9001 Quality Management System.

f

Fully licensed and insured network of technicians.

f

No Digging, excavation or destruction to property or infrastructure, eliminating damage to the environment.

f

Specialists in junction, laterals, dead end and patch re-lining, as well as specialty pipe lining projects.

f

Provide and keep on record detailed reports, footage and information of jobs, to reference back to.

f
f

50-year warranty on our innovative products.

f
f

Efficient, prompt and reliable service.

f

Our products are quality assured and compliant with international standards. We can provide all reports and technical information.

CASE STUDIES

EAST WATER TOWER

Work Performed Utilising our Blueline technology, Nuflow Wide Bay relined 4.6 metre section of a 100mm vertical sewer pipe adjacent to the footings of the heritage listed Bundaberg East Water Tower. The East Water Tower is the only circular…

GOLD COAST SEWERAGE PLANT

Work Performed Utilising our Blueline technology, Nuflow repaired 12m of a 750mm diameter reinforced concrete sewer line at the Coombabah Sewerage treatment plant. This job was completed on behalf of Corrosion Protection for the Gold Coast…

TUGUN BYPASS

Work Performed Utilising our Blueline technology, Nuflow repaired three metre long patches to stop water from infiltrating in a 600mm diameter steel reinforced concrete storm water pipe – for ABI Group. During the construction of the Tugun…

MURRAY POWER STATION

Work Performed Utilising our Blueline Technology, Nuflow Albury-Wodonga relined 2.8m of 150mm stainless steel pipe. Nuflow Albury-Wodonga were contracted by Snowy Hydro Limited to to repair a 150mm compressor lineer Station. This stainless…

KERNERS RD DEVIATION

Work Performed Utilising our Blueline technology, Nuflow installed sectional liners in multiple lengths of concrete stormwater pipes ranging from 375mm to 900mm diameter pipes. Pipes located under the recently completed $20 million Kerners…