{"id":1406,"date":"2026-02-24T16:12:39","date_gmt":"2026-02-24T06:12:39","guid":{"rendered":"https:\/\/nuflow.net\/northwest-sydney\/?p=1406"},"modified":"2026-02-25T14:16:05","modified_gmt":"2026-02-25T04:16:05","slug":"same-day-school-sewer-blockage-blacktown","status":"publish","type":"post","link":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/","title":{"rendered":"Same-Day Response To School Sewer Blockage"},"content":{"rendered":"\n<p><strong>NUFLOW NORTHWEST SYDNEY<\/strong><br>EDUCATION PRECINCT| NSW DEPARTMENT OF EDUCATION<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">PROJECT OVERVIEW<\/h2>\n\n\n\n<p>NuFlow was called for a same-day response after a blocked toilet was reported in the disabled bathroom (CR0015) of the General Learning Building (B00C). The issue was urgent, as Support Unit students needed immediate access, and the work had to be done carefully to avoid disruption during ongoing NAPLAN exams. Our inspection revealed heavy blockages of wipes, paper towels, and rubbish extending through nearly 28 metres of pipe, with limited access points available. Despite these challenges, NuFlow\u2019s team mobilized quickly, applying high- pressure cleaning, CCTV inspection, and preventive measures to restore service the same day.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">CHALLENGE<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Urgent Access Required <\/strong>\u2013 The disabled toilet was blocked, preventing students from using the facility.<\/li>\n\n\n\n<li><strong>Restricted Timing<\/strong> \u2013 Work had to be completed with minimal noise and disruption during NAPLAN exam schedules.<\/li>\n\n\n\n<li><strong>Heavy Obstruction<\/strong> \u2013 The sewer line was packed with wipes, paper towels, chip packets, and other debris across nearly 28 metres of pipe.<\/li>\n\n\n\n<li><strong>Limited Access Points<\/strong> \u2013 The first inspection opening was ineffective, and the downstream manhole was seized shut, requiring an hour of work to open.<\/li>\n\n\n\n<li><strong>Health &amp; Safety Concerns<\/strong> \u2013 Raw sewage overflowed in the manhole chamber, requiring disinfection and immediate safety measures.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"233\" src=\"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/blocked-drain-sewer-backup-stormwater-pit-nuflow-northwest-sydney-1024x233.avif\" alt=\"\" class=\"wp-image-1409\" srcset=\"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/blocked-drain-sewer-backup-stormwater-pit-nuflow-northwest-sydney-1024x233.avif 1024w, https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/blocked-drain-sewer-backup-stormwater-pit-nuflow-northwest-sydney-300x68.avif 300w, https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/blocked-drain-sewer-backup-stormwater-pit-nuflow-northwest-sydney-768x175.avif 768w, https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/blocked-drain-sewer-backup-stormwater-pit-nuflow-northwest-sydney-1536x350.avif 1536w, https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/blocked-drain-sewer-backup-stormwater-pit-nuflow-northwest-sydney.avif 2019w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">THE SOLUTION<\/h2>\n\n\n\n<p>To address the urgent blockage while minimizing disruption during NAPLAN exams, NuFlow applied a targeted approach that combined advanced cleaning methods, thorough inspection, and preventive measures. The team ensured the issue was resolved efficiently, safely, and with long-term reliability in mind.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"504\" src=\"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/high-pressure-drain-cleaning-cctv-inspection-process-nuflow-northwest-sydney-1024x504.avif\" alt=\"\" class=\"wp-image-1411\" srcset=\"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/high-pressure-drain-cleaning-cctv-inspection-process-nuflow-northwest-sydney-1024x504.avif 1024w, https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/high-pressure-drain-cleaning-cctv-inspection-process-nuflow-northwest-sydney-300x148.avif 300w, https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/high-pressure-drain-cleaning-cctv-inspection-process-nuflow-northwest-sydney-768x378.avif 768w, https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/high-pressure-drain-cleaning-cctv-inspection-process-nuflow-northwest-sydney.avif 1439w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"778\" height=\"283\" src=\"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/manhole-access-repair-pipe-sealing-nuflow-northwest-sydney.avif\" alt=\"\" class=\"wp-image-1412\" srcset=\"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/manhole-access-repair-pipe-sealing-nuflow-northwest-sydney.avif 778w, https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/manhole-access-repair-pipe-sealing-nuflow-northwest-sydney-300x109.avif 300w, https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/manhole-access-repair-pipe-sealing-nuflow-northwest-sydney-768x279.avif 768w\" sizes=\"(max-width: 778px) 100vw, 778px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">THE RESULTS<\/h2>\n\n\n\n<p>NuFlow successfully restored full functionality to the disabled bathroom on the same day, allowing students uninterrupted access to essential facilities. The sewer line was cleared of over 28 metres of heavy blockages, inspected, and verified clean via CCTV. Preventive installations were completed to reduce the risk of future blockages, while immediate disinfection ensured safety until specialist cleaners arrived. The school principal was fully briefed, and operations continued smoothly with minimal disruption during the NAPLAN testing period.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">NUFLOW\u2019S AGING INFRASTRUCTURE MAINTENANCE AND REHABILITATION<\/h2>\n\n\n\n<p>For information on how Nuflow can help maintain and rehabilitate your potable water assets<br>\u2014including pressure main relining, concrete pipeline repairs, and trenchless rehabilitation of critical supply infrastructure\u2014contact our team of specialists. We deliver safe, compliant solutions for even the most complex potable water pipe repair projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nuflow responded urgently to a blocked disabled bathroom sewer at a NSW school during NAPLAN, clearing nearly 28 m of heavy debris with high-pressure cleaning and CCTV to restore access the same day with minimal disruption.<\/p>\n","protected":false},"author":64,"featured_media":1413,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[15],"tags":[],"class_list":["post-1406","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Same-Day School Sewer Blockage Response Blacktown | Nuflow Northwest Sydney<\/title>\n<meta name=\"description\" content=\"Nuflow Northwest Sydney delivered a same-day sewer blockage solution at a NSW Department of Education school, clearing 28 m of debris with high-pressure cleaning and CCTV during NAPLAN with minimal disruption.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Same-Day School Sewer Blockage Response Blacktown | Nuflow Northwest Sydney\" \/>\n<meta property=\"og:description\" content=\"Nuflow Northwest Sydney delivered a same-day sewer blockage solution at a NSW Department of Education school, clearing 28 m of debris with high-pressure cleaning and CCTV during NAPLAN with minimal disruption.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/\" \/>\n<meta property=\"og:site_name\" content=\"Nuflow Northwest Sydney\" \/>\n<meta property=\"article:published_time\" content=\"2026-02-24T06:12:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-25T04:16:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/atlas-copco-facility-fire-pipe-rehabilitation-blog-cover-nuflow-northwest-sydney-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"360\" \/>\n\t<meta property=\"og:image:height\" content=\"234\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"studio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"studio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/\"},\"author\":{\"name\":\"studio\",\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/#\/schema\/person\/0738a219c6d4f5a3b7760cc845b920be\"},\"headline\":\"Same-Day Response To School Sewer Blockage\",\"datePublished\":\"2026-02-24T06:12:39+00:00\",\"dateModified\":\"2026-02-25T04:16:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/\"},\"wordCount\":380,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/atlas-copco-facility-fire-pipe-rehabilitation-blog-cover-nuflow-northwest-sydney-1.png\",\"articleSection\":[\"Case Studies\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/\",\"url\":\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/\",\"name\":\"Same-Day School Sewer Blockage Response Blacktown | Nuflow Northwest Sydney\",\"isPartOf\":{\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/atlas-copco-facility-fire-pipe-rehabilitation-blog-cover-nuflow-northwest-sydney-1.png\",\"datePublished\":\"2026-02-24T06:12:39+00:00\",\"dateModified\":\"2026-02-25T04:16:05+00:00\",\"author\":{\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/#\/schema\/person\/0738a219c6d4f5a3b7760cc845b920be\"},\"description\":\"Nuflow Northwest Sydney delivered a same-day sewer blockage solution at a NSW Department of Education school, clearing 28 m of debris with high-pressure cleaning and CCTV during NAPLAN with minimal disruption.\",\"breadcrumb\":{\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#primaryimage\",\"url\":\"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/atlas-copco-facility-fire-pipe-rehabilitation-blog-cover-nuflow-northwest-sydney-1.png\",\"contentUrl\":\"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/atlas-copco-facility-fire-pipe-rehabilitation-blog-cover-nuflow-northwest-sydney-1.png\",\"width\":360,\"height\":234},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/nuflow.net\/northwest-sydney\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Same-Day Response To School Sewer Blockage\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/#website\",\"url\":\"https:\/\/nuflow.net\/northwest-sydney\/\",\"name\":\"Nuflow Northwest Sydney\",\"description\":\"Blocked Drain &amp; Pipe Relining Specialists\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/nuflow.net\/northwest-sydney\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/nuflow.net\/northwest-sydney\/#\/schema\/person\/0738a219c6d4f5a3b7760cc845b920be\",\"name\":\"studio\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/2ab66c3ca50d77d00bb6703c897fef66041e32e439ef80495ebebb28a1ff7e3d?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/2ab66c3ca50d77d00bb6703c897fef66041e32e439ef80495ebebb28a1ff7e3d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/2ab66c3ca50d77d00bb6703c897fef66041e32e439ef80495ebebb28a1ff7e3d?s=96&d=mm&r=g\",\"caption\":\"studio\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Same-Day School Sewer Blockage Response Blacktown | Nuflow Northwest Sydney","description":"Nuflow Northwest Sydney delivered a same-day sewer blockage solution at a NSW Department of Education school, clearing 28 m of debris with high-pressure cleaning and CCTV during NAPLAN with minimal disruption.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/","og_locale":"en_US","og_type":"article","og_title":"Same-Day School Sewer Blockage Response Blacktown | Nuflow Northwest Sydney","og_description":"Nuflow Northwest Sydney delivered a same-day sewer blockage solution at a NSW Department of Education school, clearing 28 m of debris with high-pressure cleaning and CCTV during NAPLAN with minimal disruption.","og_url":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/","og_site_name":"Nuflow Northwest Sydney","article_published_time":"2026-02-24T06:12:39+00:00","article_modified_time":"2026-02-25T04:16:05+00:00","og_image":[{"width":360,"height":234,"url":"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/atlas-copco-facility-fire-pipe-rehabilitation-blog-cover-nuflow-northwest-sydney-1.png","type":"image\/png"}],"author":"studio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"studio","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#article","isPartOf":{"@id":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/"},"author":{"name":"studio","@id":"https:\/\/nuflow.net\/northwest-sydney\/#\/schema\/person\/0738a219c6d4f5a3b7760cc845b920be"},"headline":"Same-Day Response To School Sewer Blockage","datePublished":"2026-02-24T06:12:39+00:00","dateModified":"2026-02-25T04:16:05+00:00","mainEntityOfPage":{"@id":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/"},"wordCount":380,"commentCount":0,"image":{"@id":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#primaryimage"},"thumbnailUrl":"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/atlas-copco-facility-fire-pipe-rehabilitation-blog-cover-nuflow-northwest-sydney-1.png","articleSection":["Case Studies"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/","url":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/","name":"Same-Day School Sewer Blockage Response Blacktown | Nuflow Northwest Sydney","isPartOf":{"@id":"https:\/\/nuflow.net\/northwest-sydney\/#website"},"primaryImageOfPage":{"@id":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#primaryimage"},"image":{"@id":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#primaryimage"},"thumbnailUrl":"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/atlas-copco-facility-fire-pipe-rehabilitation-blog-cover-nuflow-northwest-sydney-1.png","datePublished":"2026-02-24T06:12:39+00:00","dateModified":"2026-02-25T04:16:05+00:00","author":{"@id":"https:\/\/nuflow.net\/northwest-sydney\/#\/schema\/person\/0738a219c6d4f5a3b7760cc845b920be"},"description":"Nuflow Northwest Sydney delivered a same-day sewer blockage solution at a NSW Department of Education school, clearing 28 m of debris with high-pressure cleaning and CCTV during NAPLAN with minimal disruption.","breadcrumb":{"@id":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#primaryimage","url":"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/atlas-copco-facility-fire-pipe-rehabilitation-blog-cover-nuflow-northwest-sydney-1.png","contentUrl":"https:\/\/nuflow.net\/northwest-sydney\/wp-content\/uploads\/sites\/69\/2026\/02\/atlas-copco-facility-fire-pipe-rehabilitation-blog-cover-nuflow-northwest-sydney-1.png","width":360,"height":234},{"@type":"BreadcrumbList","@id":"https:\/\/nuflow.net\/northwest-sydney\/same-day-school-sewer-blockage-blacktown\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/nuflow.net\/northwest-sydney\/"},{"@type":"ListItem","position":2,"name":"Same-Day Response To School Sewer Blockage"}]},{"@type":"WebSite","@id":"https:\/\/nuflow.net\/northwest-sydney\/#website","url":"https:\/\/nuflow.net\/northwest-sydney\/","name":"Nuflow Northwest Sydney","description":"Blocked Drain &amp; Pipe Relining Specialists","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/nuflow.net\/northwest-sydney\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/nuflow.net\/northwest-sydney\/#\/schema\/person\/0738a219c6d4f5a3b7760cc845b920be","name":"studio","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/2ab66c3ca50d77d00bb6703c897fef66041e32e439ef80495ebebb28a1ff7e3d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/2ab66c3ca50d77d00bb6703c897fef66041e32e439ef80495ebebb28a1ff7e3d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2ab66c3ca50d77d00bb6703c897fef66041e32e439ef80495ebebb28a1ff7e3d?s=96&d=mm&r=g","caption":"studio"}}]}},"_links":{"self":[{"href":"https:\/\/nuflow.net\/northwest-sydney\/wp-json\/wp\/v2\/posts\/1406","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/nuflow.net\/northwest-sydney\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nuflow.net\/northwest-sydney\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nuflow.net\/northwest-sydney\/wp-json\/wp\/v2\/users\/64"}],"replies":[{"embeddable":true,"href":"https:\/\/nuflow.net\/northwest-sydney\/wp-json\/wp\/v2\/comments?post=1406"}],"version-history":[{"count":4,"href":"https:\/\/nuflow.net\/northwest-sydney\/wp-json\/wp\/v2\/posts\/1406\/revisions"}],"predecessor-version":[{"id":1571,"href":"https:\/\/nuflow.net\/northwest-sydney\/wp-json\/wp\/v2\/posts\/1406\/revisions\/1571"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nuflow.net\/northwest-sydney\/wp-json\/wp\/v2\/media\/1413"}],"wp:attachment":[{"href":"https:\/\/nuflow.net\/northwest-sydney\/wp-json\/wp\/v2\/media?parent=1406"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nuflow.net\/northwest-sydney\/wp-json\/wp\/v2\/categories?post=1406"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nuflow.net\/northwest-sydney\/wp-json\/wp\/v2\/tags?post=1406"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}