{"id":1269,"date":"2023-06-02T12:24:25","date_gmt":"2023-06-02T02:24:25","guid":{"rendered":"https:\/\/nuflow.net\/cairns\/?p=1269"},"modified":"2023-06-02T12:24:26","modified_gmt":"2023-06-02T02:24:26","slug":"pipe-relining-ensures-business-as-usual-for-busy-government-office-building","status":"publish","type":"post","link":"https:\/\/nuflow.net\/cairns\/pipe-relining-ensures-business-as-usual-for-busy-government-office-building\/","title":{"rendered":"Pipe relining ensures business as usual for busy government office building"},"content":{"rendered":"\n
When you\u2019re working at the office and trying to concentrate, the last thing you need is noisy construction or repair work disrupting you. So when repairs were needed at a major government building in Cairns, the building managers were looking for a solution to avoid noise and other disruptions that interrupt workday life.<\/p>\n\n\n\n
The building itself has stormwater pipes which run down from the roof, through the concrete walls and along the ceiling cavities. Over the years, due to a mix of ageing pipes, deterioration and movement in the building, the stormwater pipes had started to leak. If this leaking persisted, it would not only cause flooding in the building, but also mould and potential health risks for occupants.<\/p>\n\n\n\n
The managers needed a solution to fix the leaks, so the building\u2019s plumbing hydraulic engineer investigated their options and provided recommendations for the repairs.<\/p>\n\n\n\n
One option for repairs was to replace the broken stormwater pipes altogether. This would have required costly repairs to reinstate the ceilings and walls to their existing state. The building\u2019s walls are made of solid tilt slab wall-panelling with difficult-to-get to-ceiling and concealed wall cavities, so any works done to access the stormwater pipes would have required major excavation and costly repairs.<\/p>\n\n\n\n
This kind of project would have taken up to five months to complete, potentially longer, and would most likely have required the building\u2019s workers to relocate during repairs.<\/p>\n\n\n\n
Another option was pipe relining. This innovative plumbing solution delivered by our team at Nuflow Cairns involved creating a new pipe within the existing pipes, without the need to cut into walls or remove the ceiling. This solution is also perfect for non-destructive pipe repairs in those hard-to-access locations.<\/p>\n\n\n\n
Keen to avoid any downtime, the building management team chose to go ahead with Nuflow Cairns and the pipe relining.<\/p>\n\n\n\n
Our expert team used a hardy, specialist material to reline the affected pipes, sealing off any cracks and fixing the problem faster and with far less interruption than replacing the stormwater pipes altogether. We are able to fix the leaks without any destruction.<\/p>\n\n\n\n